But ever tried holding a 9 a.m. stand-up about a delayed install while the CNC swears it forgot the last pass because it ran out of Friday? We caught it in QC with the go/no-go gauge at 0.8 mm off, re-sequenced the line in 12 minutes, and I still got to be the bad cop for protecting the timeline. Anyone else pull a crew of 14 off a machine’s mood swing and live to rebaseline the schedule?