Balancing schedule and safety in an 8-week shutdown

We’re expanding a line under an 8-week shutdown, and I need a clean sequence that meets OSHA 1910, NFPA 79, and the local AHJ while holding the commissioning date. How are you slotting LOTO verification, machine guarding checks, and electrical tie-ins in a 3-shift plant to avoid hot work and near-miss risk without slipping the critical path?

‌⁠‍⁠​‍​‍‌⁠‌​​‍​‍​⁠‍‍​‍​‍‌‍‌⁠‌‍⁠‌‌‍‍‍​⁠‌​​‍​‍​‍⁠​​‍​‍‌‍‍⁠​‍​‍​⁠‍‍​‍​‍‌‍⁠‍‌‍‌‌‌⁠‌⁠‌‌⁠⁠‌⁠‌​‌‍⁠⁠‌⁠​​‌‍‍‌‌‍​⁠​‍​‍​‍⁠​​‍​‍‌‍‍‌‌‍‌​​‍​‍​⁠‍‍​‍​‍‌‍⁠‍‌‍‌‌‌⁠‌⁠​‍​‍​‍⁠​​‍​‍‌‍‌​​‍​‍​⁠‍‍​‍​‍​⁠​‍​⁠​​​⁠​‍​⁠‌‌​⁠​‌​⁠​‍​⁠​‌​⁠‍‌​‍​‍​‍⁠​​‍​‍‌‍‍​​‍​‍​⁠‍‍​‍​‍‌​‍⁠​⁠​​‌​⁠‍‌​‌‌‌‍‍‍‌‌‌‍‌‍​⁠‌‌⁠⁠‌‌‌‍‌‌‌‌‌‍​‍‌⁠​‍‌‌‌‍‌‍‍⁠‌​⁠⁠‌⁠‍‌​‍​‍‌⁠⁠‌​